Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

 
OUR SERVICE
REFERENCE

A01 - TEAM SERVICE


A02 - CLEAN ROOM UNIFORM


A03 - INSTALL HEAT TEMPERATURE


A04 - INSTALL WIRE WAY & PNEUMATIC SYSTEM


A05 - INSTALL WIRE WAY & PNEUMATIC SYSTEM


A06 - INSTALL POWER PLUG


A07 - INSTALL POWER PLUG


A08 - INSTALL SOLENOID VALVE


A10 - INSTALL SPEAKER


A11 - INSTALL AIR CONDITION


A12 - INSTALL AIR CONDITION


A13 - INSTALL FLOATLESS LEVEL CONTROLLER


A14 - INSTALL FORMEGA WALL


A15 - INSTALL METAL SHEET ROOM


A16 - INSTALL ISO WALL ROOM


A17 - INSTALL GETLIGHT ROOF



A18 - INSTALL LIGHTING


A19 - INSTALL LIGHTING


A20 - INSTALL LIGHTING


A21 - INSTALL LIGHTING


A22 - INSTALL VACUUM


A23 - INSTALL VACUUM


A24 - INSTALL FORMEGA HALF GLASS


A25 - INSTALL FORMEGA HALF GLASS


A26 - INSTALL FORMEGA HALF GLASS


A27 - PREVENTIVE MAINTENANCE FOR POWER SUPPLY SYSTEM


A28 - PREVENTIVE MAINTENANCE FOR POWER SUPPLY SYSTEM


A29 - PREVENTIVE MAINTENANCE FOR POWER SUPPLY SYSTEM


A30 - INSTALLATION DUCT AIR CONDITION


A31 - INSTALL MCCB & CABLE WIRE


A32 - INSTALL EXHAUST


A33 - INSTALL EXHAUST


A34 - INSTALL EXHAUST


A35 - INSTALL WET-SCRUBBER


A36 - INSTALL WET-SCRUBBER



A37 - INSTALL CHILLER 45 TONS


A38 - INSTALL CHILLER 45 TONS


A39 - INSTALL DUCTING


A40 - INSTALL DUCTING


A41 - INSTALL EXHAUST DUCTING



A42 - INSTALL UTILITY FOR MACHINE


A43 - REPAINTING FLOOR



A44 - INSTALL DUCTING (AIR SUPPLY)


A45 - INSTALL AIR CONDITION


A46 - INSTALL EXHAUST SYSTEMS


A47 - INSTALL VACUUM SYSTEMS



A48 - INSTALL VACUUM SYSTEMS



A49 - CHECK AIR FLOW BEFORE BY OFF PROJECT



A50 - INSTALL EXHAUST FAN


A51 - INSTALL EXHAUST FAN


A52 - INSTALL EXHAUST SYSTEMS



A53 - INSTALL & REMOVE EXHAUST SYSTEM FOR M/C


A54 - INSTALL & REMOVE EXHAUST SYSTEM FOR M/C


A55 - INSTALL WALL & CEILLING (PVCLAMINATED)


A56 - CONSTRUCTION WORK


A57 - CONSTRUCTION WORK


A58 - PREPARING COPPER WIRE FOR CONDUCTIVE FLOOR


A59 - BUILDING CLEAN ROOM (900 SQ.M.)


A60 - BUILDING CLEAN ROOM (900 SQ.M.)



A61 - INSTALL UPVC PIPING SYSTEMS


A62 - PREPARE FOUNDATION FOR TRANSFORMER 2,000 kVA


A63 - INSTALL TRANSFORMER 2000 kVA


A64 - INSTALL TRANSFORMER 2000 kVA


A65 - INSTALL TRANSFORMER 2000 kVA



A66 - INSTALL ELECTRICAL CABLE SYSTEMS


A67 - CHECK RESISTANCE BY MEGA OHM METER


A68 - DESIGN & INSTALL MAIN DISTRIBUTION BOARD (MDB)


A69 - DESIGN & INSTALL MAIN DISTRIBUTION BOARD (MDB)


A70 - DESIGN & INSTALL AHU 60 TONS
(AIR CONDITION & VENTILATION SYSTEMS)



A71 - DESIGN & INSTALL AHU 60 TONS
(AIR CONDITION & VENTILATION SYSTEMS)


A72 - INSTALL UTILITY SYSTEMS FOR INDUSTRIAL
- CHIANGMAI FROZEN FOODS(PUBLIC)CO.,LTD.
- HOYA OPTICS (THAILAND) LTD.
- KEIHIN (THAILAND) CO., LTD.
- SCHAFFNER EMC CO.,LTD.
- INNOVEX (THAILAND) LTD.
- KEC (THAILAND) CO., LTD.
- TSP - T CO., LTD.
- THAI NJR CO., LTD.
- TANAKA PRECISION (THAILAND) CO. LTD

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player