- CHIANGMAI FROZEN FOODS(PUBLIC)CO.,LTD.
- HOYA OPTICS (THAILAND) LTD.
- KEIHIN (THAILAND) CO., LTD.
- SCHAFFNER EMC CO.,LTD.
- OPTREX (THAILAND) CO., LTD
- INNOVEX (THAILAND) LTD.
- KEC (THAILAND) CO., LTD.
- TSP - T CO., LTD.
- THAI NJR CO., LTD.
- NAMIKI PRECISION (THAILAND) CO., LTD.
- ANANTARA RESORT & SPA (CHIANGRAI)
- UNION FROZED CO., LTD. (LAMPANG)
REFERENCE
 

 


A01 - TEAM SERVICE


A02 - CLEAN ROOM UNIFORM


A03 - ADDITION GYPSUM WALL


A04 - ADDITION GYPSUM WALL


A05 - INSTALL UTILITY MC


A06 - INSTALL UTILITY MC


A07 - INSTALL UTILITY MC


A08 - INSTALL UTILITY MC


A09 - INSTALL AUTO SLIDE DOOR


A10 - INSTALL AUTO SLIDE DOOR


A11 - DRAWING IMPROVEMENT CABLE WIRE VACUUM


A12 - DRAWING REMOVE GENERATOR MC


A13 - INSTALL EXHAUST FAN


A14 - INSTALL EXHAUST FAN


A15 - DRAWING INSTALL EXHAUST FAN & HOOD


A16 - DRAWING INSTALL UTILITY MC


A17 - INSTALL WIRE WAY & PNEUMATIC SYSTEM


A18 - INSTALL WIRE WAY & PNEUMATIC SYSTEM


A19 - INSTALL POWER PLUG


A20 - INSTALL POWER PLUG


A21 - DRAWING REMOVE AIR CONDITION


A22 - DRAWING INSTALL DUCTING


A23 - INSTALL DUCTING (AIR SUPPLY)


A24 - INSTALL AIR CONDITION


A25 - INSTALL EXHAUST SYSTEMS


A26 - ADDITION DUCT AIR CONDITION


A27 - INSTALL EXHAUST


A28 - INSTALL EXHAUST


A29 - INSTALL DUCTING


A30 - INSTALL EXHAUST DUCTING


A31 - INSTALL FLOATLESS LEVEL CONTROLLER


A32 - INSTALL FORMEGA WALL


A33 - INSTALL METAL SHEET ROOM


A34 - INSTALL ISO WALL ROOM


A35 - INSTALL VACUUM


A36 - INSTALL VACUUM


A37 - INSTALL FORMEGA HALF GLASS


A38 - INSTALL FORMEGA HALF GLASS


A39 - INSTALL FORMEGA HALF GLASS


A40 - PREVENTIVE MAINTENANCE FOR POWER SUPPLY SYSTEM


A41 - PREVENTIVE MAINTENANCE FOR POWER SUPPLY SYSTEM


A42 - PREVENTIVE MAINTENANCE FOR POWER SUPPLY SYSTEM


A43 - INSTALL MCCB & CABLE WIRE


A44 - INSTALL CHILLER 45 TONS


A45 - INSTALL CHILLER 45 TONS


A46 - INSTALL TRANSFORMER 2000 kVA


A47 - INSTALL TRANSFORMER 2000 kVA


A48 - INSTALL ELECTRICAL CABLE SYSTEMS


A49 - CHECK RESISTANCE BY MEGA OHM METER


A50 - INSTALL UTILITY FOR MACHINE


A51 - REPAINTING FLOOR


A52 - INSTALL VACUUM SYSTEMS


A53 - INSTALL VACUUM SYSTEMS


A54 - CHECK AIR FLOW BEFORE BY OFF PROJECT


A55 - INSTALL EXHAUST FAN


A56 - INSTALL EXHAUST FAN


A57 - INSTALL & REMOVE EXHAUST SYSTEM FOR M/C


A58 - INSTALL & REMOVE EXHAUST SYSTEM FOR M/C


A59 - CONSTRUCTION WORK


A60 - CONSTRUCTION WORK


A61 - PREPARING COPPER WIRE FOR CONDUCTIVE FLOOR


A62 - BUILDING CLEAN ROOM (900 SQ.M.)


A63 - INSTALL WET-SCRUBBER


A64 - INSTALL WET-SCRUBBER


A65 - INSTALL UPVC PIPING SYSTEMS


A66 - DESIGN & INSTALL MAIN DISTRIBUTION BOARD (MDB)


A67 - DESIGN & INSTALL AHU 60 TONS
(AIR CONDITION & VENTILATION SYSTEMS)


A68 - INSTALL UTILITY SYSTEMS FOR INDUSTRIAL


A69 - INSTALL SOLENOID VALVE


A70 - INSTALL HEAT TEMPERATURE


A71 - INSTALL GETLIGHT ROOF


A72 - INSTALL LIGHTING


A73 - INSTALL LIGHTING


A74 - INSTALL SPEAKER